Showing posts with label Jason Chaffetz. Show all posts
Showing posts with label Jason Chaffetz. Show all posts

Friday, May 19, 2017

Jason Chaffetz Folds Up His Cot and Goes Home






















Jason Chaffetz, the esteemed Representative from Utah's 3rd Congressional District, announced yesterday that he will resign from Congress on June 30, which sets up a special election for someone to serve out the remainder of his term.

He says he's leaving Washington because he's tired of sleeping on a cot in his office, and can no longer endure the burden of being away from his wife and kids.
My life has undergone some big changes over the last 18 months. Those changes have been good. But as I celebrated my 50th birthday in March, the reality of spending more than 1,500 nights away from my family over eight years hit me harder than it had before.

Julie and I have been married for over 26 years. We have three wonderful children. Two of our children got married over the past 18 months – each having found an amazing spouse. I couldn’t be more proud of them. Our oldest son recently graduated from the University of Utah and his wife from BYU. In August, they will move out of state for law school. Our daughter, who attended UVU, married a great young man who found a terrific job two time zones away. Our youngest daughter remains at home attending high school, but soon she, too, will spread her wings and set off on her life’s path. Julie and I are facing the reality of being empty nesters. All of us, it appears, are ready to begin a new chapter.

I’ve slept on a cot in my office largely to save money for the Chaffetz family, but also to remind myself that my service there was temporary. Though the time away and the travel have been a sacrifice, our family has always been united that public service was the right thing to do. We feel my time in congress has been well spent, but it now seems the right time to turn the page.

Okay. But I'm a little confused. Is this "I'm resigning to spend more time with my family," or a mid-life crisis, or something more opportunistic?

He spent 1,5000 nights away from the kids when they were young(er), but now that they're moving out of the house he finds the separation all too much to endure any longer?

Why resign now? He ran for reelection just six months ago. Did that cot get a lot more uncomfortable all of a sudden?

Why force a special election to fill his vacant seat? He could have announced his plans to retire and then finished his term, allowing his constituents a normal election cycle. Resigning out of the blue also leaves his Oversight Committee in the lurch, since he just called for a new round of high-profile investigations and now they'll need to fill his chairmanship in a big hurry.

I'm always happy to see an entrenched Congressman go away. But I don't think Jason will be going far, or away for very long.







Friday, April 21, 2017

Jason For What in 2028?

Jason pops smoke and leaves the AO























I cannot help but see our esteemed Representative from Utah's 3rd Congressional District, Jason Chaffetz, as other than a Walter Mitty would-be tough guy, which is why I like to depict him as an action figure. Something small and harmless, but big in little-boy macho fantasies.

He posted this long goodbye to his political career on his FB page two days ago:
After long consultation with my family and prayerful consideration, I have decided I will not be a candidate for any office in 2018.

Since late 2003 I have been fully engaged with politics as a campaign manager, a chief of staff, a candidate and as a Member of Congress. I have long advocated public service should be for a limited time and not a lifetime or full career. Many of you have heard me advocate, “Get in, serve, and get out.” After more than 1,500 nights away from my home, it is time. I may run again for public office, but not in 2018.

For those that would speculate otherwise, let me be clear that I have no ulterior motives. I am healthy. I am confident I would continue to be re-elected by large margins. I have the full support of Speaker Ryan to continue as Chairman of the Oversight and Government Reform Committee. That said, I have made a personal decision to return to the private sector.

What did he ever do in the private sector before he ran for Congress? He was a marketing guy for a Utah-based pyramid scheme called Nu Skin International, which is his biggest campaign contributor, and then he unsuccessfully applied for a job with the U.S. Secret Service. It's not like he has a private sector career to go back to.

It's hard to believe that such a major self-promoter as Rep. Chaffetz would ever leave politics. Some don't believe it, and point out that Chaffetz's campaign committee registered the domains Jason2028.com and JasonChaffetz2028.com just a couple weeks ago.

The answer must lie in the world of Utahn politics, where Senator Hatch really is retiring, and the manuvering to replace him is in high gear. Jason no doubt has something in mind for his future, and I don't think it's hawking that get-rich-quick scheme again.

 

Friday, March 17, 2017

White House Fence Jumper Spent 16 Minutes on the Grounds Undetected
















A surprising new development in the case of that White House fence-jumping incident back on March 10 happened today, when the Secret Service publically acknowledged that the intruder was loose on the White House grounds for an incredible 16 and a half minutes before they found and arrested him.
At 11:21:38 pm an individual breached an outer perimeter fence near the Treasury complex, near East Executive Avenue. This fence is approximately 5 feet in height. The individual proceeded within the secure perimeter and scaled an 8 foot vehicle gate. The individual then proceeded to climb over a 3 ½ foot fence near the SE corner of the East Wing of the White House grounds. Uniformed Division Officers attempted to ascertain the location and identity of the individual. At 11:38:00 pm, the individual was taken into custody on the grounds without incident.

But now the House Oversight Committee is on the job, and we can be sure that Chairman Jason Chaffetz will soon be on top of the situation.

The Secret Service has only itself to blame, of course. If only it hadn't turned Chaffetz down when he applied for a job as an agent, he wouldn't have a platform from which to oversee it now.

Thursday, December 8, 2016

House Oversight Cmte Scopes Out Embassy Construction Cost Overruns

What is up with this misguided love of night vision gear? 













Consumer Notice: This post is certified 100% free of Matters of Official Concern that are not referenced from publicly available sources of information.

I get it that House Oversight Committee Chairman Representative Jason Chaffetz won't have Overseas Buildings Operations Director Lydia Muniz to kick around much longer, what with her being a political appointee and therefore departing her position by January 20. But the majority staff report he released this week is "littered with unsubstantiated allegations, cherry-picked evidence, and conclusions that contradict the overwhelming evidence that we obtained," in the words of the Ranking Member from the minority side of his committee. Really, what was the big hurry that this report couldn't have waited for a review by the minority side and a vote by the whole committee?

The State Department's Assistant Secretary for Legislative Affairs asked the Committee to submit the report for an interagency classification and sensitivity review before releasing it to the public, since it "details security methods and vulnerabilities at specific embassy construction sites, provides information that could be used to identify and target classified areas and communications, describes methods used to secure classified areas, and provides information about the Department's foreign intelligence countermeasures." But did they? No.

Here's that letter from State to Chairman Chaffetz, courtesy of CBS News.




UPDATE on December 29: I see that the HOGR Committee has now, properly and responsibly, withdrawn its staff report from the public sphere. Accordingly, I've deleted the remainder of this post. In the event the Committee re-releases the report, I'll comment again at that time.



Friday, December 4, 2015

House Oversight Committee Releases Report on U.S. Secret Service














Read the report here U.S. Secret Service: An Agency in Crisis (alternative title: Jason's Revenge). Be prepared to spend several hours, because it's a long compendium of scandals, misconduct, failures, abuse, mismanagement, and collapsing morale.

Best quote from a Secret Service agent's e-mail was this item on a pre-departure checklist: “Cash fo dem hoes-check


Wednesday, December 2, 2015

House Oversight Committee Hearing on New London Embassy

The Crystal Fortress, in architectural vision












The New London Embassy construction project has come in for criticism from the House Oversight and Government Reform Committee before, and it will again on Tuesday, December 8, at 10 AM. Watch this space for live video: Review of the New London Embassy Project.

While you're waiting please enjoy Embassy London's weekly photos of the construction site, and let your inner architect be inspired by the designer's vision:
[The State Department] wanted to pursue a new paradigm in embassy design, termed Design Excellence, which emphasizes the role of architecture in diplomacy. This new model seeks buildings that represent the ideals of the American government—giving priority to transparency, openness, and equality, and drawing on the best of American architecture, engineering, technology, art, and culture.

Here's hoping my good friends in Overseas Buildings Operations will send their first string to handle the Committee. Which means Ambassador Will Moser. I really don't think that OBO's Director and her Deputy Director in Charge of Design Excellence are up to handling the hostile questioning that is likely to come to them.

Sunday, October 18, 2015

FBI's Hoover Building HQ - Not Worth Fixing, And Too Expensive to Replace

The Hoover Building in Legos (better built than the real thing)













Will Representative Jason Chaffetz and his House Oversight and Government Reform Committee please take official notice of the Hoover Building? Chaffetz is hot on the trail of cost overruns and purported mismanagement in the case of U.S. embassy overseas office building construction, but he's passing up a good one right in front of his face in the Federal Triangle of Washington DC.

The FBI's Headquarters building is a well-known architectural, managerial, financial, and security disaster. The inability of the USG to either fix or replace it is a disaster of another kind. See the WaPo story of this week, which asks a good question - The FBI’s headquarters is falling apart. Why is it so hard for America to build a new one? That kind of question is right up HOGR's alley, isn't it?

How big a disaster is the FBI headquarters building, exactly? Well, it is only forty years old yet the structure is already collapsing - big chunks of it drop off regularly. The office space is dysfunctional - only 53 percent of it is judged to be usable. It is insufficient to house all headquarters' activities - the FBI has non-consolidated annexes all over the region. It cannot comply with modern Federal office building security standards, policies, and best practices due to its design and location, especially its total lack of setback distance from surrounding streets.

That's all bad enough. But consider that the Hoover Building was the most expensive new federal office building ever when it was completed in 1975 at a cost of $126 million. That final cost was more than double the original cost estimate of $60 million. Was HOGR asleep at the switch back in the 1970s, too?

The current cost estimates for a replacement FBI Headquarters run between $1.4 and $2 billion. That is more than twice the cost of the much-maligned new U.S. Embassy in Baghdad, a project that drew intense House Oversight, if not much Reform, less than ten years ago. And unlike in Baghdad, the FBI doesn't need a campus full of 20-some buildings, perimeter walls and gates, defenses against mortars and rockets, on-compound housing and feeding for its staff and third-country security guards, an aviation wing, medical facilities, and more stuff like that. Not to mention that there was a very active war going on all around, and sometimes on, that Baghdad construction site.

If the FBI does manage to get a new Headquarters built someday, it will have to be on the outskirts of Washington DC in order to get the setback distances that are necessary to meet our domestic government office building security standards. Those standards, BTW, are not nearly as onerous as their counterparts for overseas buildings.

Why is it that Rep Chaffetz will spend so much time and trouble to beat up on my good friends in the Bureau of Overseas Buildings Operations over comparatively penny-ante costs and overruns for U.S. embassy construction and security in places like Kabul, London, Jakarta, and Mexico City, but then give the FBI a pass for running a decrepit and security-deficient headquarters building and pursuing a TWO BILLION DOLLAR replacement project?

A few excerpts from the WaPo:

Beneath the headquarters of America’s premier crime-fighting organization, one of the parking ramps has been condemned because corroded pieces of the ceiling were falling on cars.

Netting hangs on the Ninth Street facade to prevent broken concrete from hitting passersby 160 feet down on the sidewalk below. During a July fire drill, half of the building’s alarms didn’t go off.

-- snip --

Three years ago, the federal government launched a search for a new site for its headquarters but that effort is months behind schedule. FBI officials fear that with Congress increasingly unwilling to pass funding measures, the move to a new building could be dramatically pushed back or set aside following next year’s election.

-- snip --

Looming over the process is the failed attempt to consolidate the Department of Homeland Security, whose own headquarters consolidation in Southeast D.C. won approval six years ago but is less than one-quarter complete, a decade behind schedule and more than $1 billion over budget.

Nearly three years after the FBI’s search began a final location has not been identified and funding has not been secured. In the meantime, the FBI’s 9,500 headquarters employees are spread throughout 14 locations in the Washington region.

-- snip --

In an effort to secure its perimeter, the FBI shuttered some exterior entrances and put 298 cement planters on the sidewalks around the building, most of them filled with only dirt because plants were deemed too costly to maintain. The netting on Ninth Street catches falling pieces of concrete; Director James B. Comey Jr. keeps one of the larger pieces in his office.

Further retrofitting is prohibitively expensive; despite the Hoover building’s overall size of 2.4 million gross square feet only 53 percent of that is usable according to a 2011 report from the Government Accountability Office.

-- snip --

As the Hoover’s problems worsened, the FBI and GSA planned a 2.1-million-square-foot campus that could accommodate 11,000 FBI personnel within two-and-a-half miles of the Capital Beltway and two miles of a Metro station.

Unlike the Hoover Building, which is separated by a sidewalk from traffic, the new campus would likely have 50-foot setbacks with blast-resistant façades and separate facilities for mail screening and visitors.

GSA officials, lacking congressionally approved funds to build such a campus, proposed a novel solution to pay for it, trading the Hoover Building site for the money needed to build the new facility.

The strategy aimed to take advantage of booming property values along Pennsylvania Avenue and to avoid the fate of St. Elizabeths, where Congress approved the consolidation of the Department of Homeland Security but repeatedly failed to provide construction money. The search has narrowed to three sites, in Greenbelt, Landover and Springfield, and attracted a half dozen big money development teams interested in the work.

-- snip --

Without funding, Hoover and the other FBI buildings will remain in a state of purgatory — not worth fixing, but not worth saving.

It seems to me the U.S. taxpayers are in another kind of purgatory, stuck with the bill for two perpetually unfinished multi-billion dollar office consolidation projects - the FBI's, and the even more expensive and screwed-up beyond repair DHS headquarters - neither of which Congress will either cancel or fund sufficiently to bring them to completion.

Where can the taxpayers go to get oversight and reform of that situation?

Thursday, October 1, 2015

Secret Service Shoots Itself in the Foot

What is going on at the U.S. Secret Service? I mean, I dislike Representative Jason Chaffetz as much as anyone, but really? Leaking gossipy tidbits to the press is very petty harassment, not to mention a violation of the Privacy Act when those tidbits come from your internal official files. Also not to mention stupid and reckless, since who else but Secret Service insiders could have accessed the 12-year old file on Chaffetz's unsuccessful application for a Secret Service agent job, and didn't they realize that would come back to bite the Service at a time when it can ill afford any more scandals?

The OIG report on this incident is short and sweet. A couple excerpts:
We have substantially completed our review of the allegation and have determined that a Secret Service database containing sensitive personally identifiable information (PII) pertaining to Congressman Jason Chaffetz, Chairman of the House Committee on Oversight and Government Reform, was accessed on approximately 60 occasions by Secret Service employees. We have concluded that a vast majority of those who had accessed the information did so in violation of the Privacy Act, as well as Secret Service and DHS policy. Additionally, we identified one individual who acknowledged disclosing information protected by the Privacy Act to an outside source. However, because the number of individuals with access to this information was so great, we were unable to identify others who may have disclosed protected information to third parties.

[Chaffetz's] application had not been acted upon and the applicant had not been interviewed, reflected in MCI by a data field that read “BQA,” which meant that other better qualified applicants existed.

We identified 18 supervisors at the GS-15 or Senior Executive Service level who appeared to have known or should have known, prior to the publication of the fact, that Chairman Chaffetz’ MCI record was being accessed.

Moreover, at least one senior Secret Service executive, who knew about the fact of the Chaffetz application, suggested that it be leaked. On March 31st, two days before the publication of the information, Ed Lowery, who is an Assistant Director and in charge of training for the Secret Service, replied to an email from Faron Paramore, another Assistant Director who was in charge of Congressional and public affairs. Paramore’s email distributed a press statement by Secretary Johnson regarding Chairman Chaffetz’ decision to subpoena Secret Service agents. Lowery’s reply, sent only to Paramore, is reprinted in its entirety:

















"Some information that he might find embarrassing needs to get out there."

An Assistant Director was incautious enough to say that in an e-mail? A 'better qualified applicant' will be found for his job very soon, I think.


Wednesday, July 8, 2015

House Oversight Commitee Hearing Tomorrow on Embassy Kabul Construction Delays

Architect's-eye view of U.S. Embassy Kabul, Afghanistan (GAO report)













It will be Must-See TV tomorrow morning when the House Oversight and Government Reform Committee holds a hearing on Kabul. Representative Jason Chaffetz will school OBO Director Lydia Muniz and Diplomatic Security Assistant Secretary Gregory Starr on how to do construction work in a war zone with maximum efficiency, because, you know, like, that's something he would know all about.

Here's the hearing announcement: Construction Costs and Delays at the U.S. Embassy in Kabul. The stated purpose of the hearing is to "examine the State Department’s risk management practices overseas, focusing on construction of the new U.S. embassy compound in Kabul, Afghanistan" and also to "continue the Oversight Committee’s examination of safety and security of U.S personnel serving in embassies and consulates around the world."

Here's the GAO report that will be the factual basis for the substance of the hearing. Cheffetz will supply everything else a good entertaining hearing needs, like melodrama and histrionics.

Thursday, May 28, 2015

Rep. Jason Chaffetz Plugs His Next Oversight Hearing (New Construction at U.S. Embassy Mexico)

Representative Jason Chaffetz was interviewed by CBS News today and he dropped the bombshell news that there are some problems with the big new U.S. Embassy construction project in Mexico City.

It is an embassy that was supposed to cost $577 million to build, but the construction estimate has gone up by one third -- and the State Department hasn't even broken ground yet.

No one disputes that the current U.S. Embassy in Mexico City is crowded, outdated and needs to be replaced. So four years ago the State Department bought a 15 acre plot in a former industrial district for $120 million. But there was a catch: the site had housed a Colgate-Palmolive factory for decades, which left behind hazardous waste. Colgate has been cleaning the site but it's been three and a half years and it's still not ready for construction.

"It's a bit of a fiasco," said Rep. Jason Chaffetz, R-Utah.

Fiasco? I've seen fiascos, and this isn't one yet. The Mexico City project is certainly a Real Big Deal for the Bureau of Overseas Buildings Operations, its first new embassy job to be executed from start to finish under OBO's Design Excellence program. Also very costly, which is a given due to the large size of U.S. Embassy Mexico, with over 1,300 'desk positions' to be accommodated.

There are also environmental remediation problems to be worked out with the previous owner of the construction site. That site is a so-called 'brown field,' a property that had a prior industrial use and is being redeveloped, in contrast to a 'green field' or previously undeveloped property. Building in brown fields is part of the whole design excellence whim-wham, since it allows new embassies to be located near city centers rather than on their edges or beyond (which is a common complaint about Fortress Embassies). The Mexico City project is squarely in the center of the city, and only about 4 kilometers from the current embassy location.

As for the high cost of the project, that will presumably be offset by the proceeds of sale of existing embassy properties, some of which are in super-prime locations. That intention was announced way back in 2010 when the embassy signed the contract to acquire the construction site:
Mexico City, October 27, 2010 —Ambassador Anthony Wayne, on behalf of the U.S. Department of State, today signed a contract with Colgate-Palmolive, S.A. de C.V., to acquire a property in the New Polanco area of Mexico City in order to construct a new United States Embassy to replace the existing building on Paseo de la Reforma … The existing embassy compound on Reforma, as well as any excess land at the new site, will be offered for sale at a later date.

Fourteen sites are now up for sale, which means that the taxpayers might come away from this deal with a profit.

By the way, there is absolutely nothing new or newsworthy in this matter, no matter how breathlessly Rep. Chaffetz revealed it all to CBS News. You could read all about the Mexico City project, and Congressional concern for costs and environmental remediation, in the last appropriations bill for STATE, FOREIGN OPERATIONS, AND RELATED PROGRAMS:
Enhanced notification requirements.—The Congressional Budget
Justification for Department of State Operations, Fiscal Year 2015 estimates the cost for construction of the New Embassy Compound in Mexico City, Mexico at $763,500,000. The Committee is troubled that this is an escalation in cost of more than 38 percent in the two years since the initial estimate was provided. Cost increases of this magnitude, as well as reports of other new embassy project cost escalations, are of great concern to the Committee. Accordingly, in order to enhance the oversight of new construction projects, the Committee recommendation modifies and expands section 7004(d) of the bill to require that all notifications for the purchase of land and for the award of construction contracts be subject to the regular notification procedures of, and prior approval by, the Committees on Appropriations.

Notifications made pursuant to section 7004(d) shall include the following information, at a minimum: (1) the location and size of the property to be acquired, including the proximity to existing United States diplomatic facilities and host government ministries; (2) the justification of need for acquiring the property and construction of new facilities; (3) the total projected cost of the project delineated by site acquisition, project development, design/construction, and any other relevant costs; (4) any unique requirements of the project which may drive up the cost of the project, such as consular workload, legal environment, physical and/or security requirements, and seismic capabilities; (5) any religious, cultural, or political factors which may affect the cost, location, or construction timeline; (6) the current and projected number of desks, agency presence, and the projected number of United States direct hire staff, Locally Engaged Staff, and Third Country Nationals; (7) the current and projected number of beds, if applicable; (8) the most recent rightsizing analysis; and (9) a justification for exceeding the staffing projections of such rightsizing analysis, if applicable. Additionally, the Committee directs the Department of State to carefully review the design and cost of the Mexico City new embassy compound and to provide updated design plans and options for reducing the cost of the facility to the Committees on Appropriations prior to the obligation of additional funds for this project from funds made available in this Act or prior Acts.

Watching Rep. Chaffetz do his song and dance for CBS News was more entertaining than reading that dry appropriations bill language, I will concede. But he brings nothing new of substance.

Wednesday, March 25, 2015

Rep Chaffetz Wants To Throw a Net Over This City

Special Agent Jason Chaffetz takes 'em down!
















Judging by the enthusiasm with which he badgered the Director of the U.S. Secret Service at yesterday's Oversight Committee hearing, Representative Jason Chaffetz, the bad-ass wannabe who represents Utah's 3rd District, seems to have found a new pet project and outlet for his Walter Mitty side.

If the Secret Service keeps giving him such great material for oversight he might even forgot about his other pet project, embassy security.

Okay, so yesterday's hearing was an utter embarrassment for the Secret Service. Both sides of the Committee took turns hitting the witness hard, and the Service had it coming. But then, about two and a half hours into it, Chairman Chaffetz suddenly peeled out of formation and launched into an outburst of threats and obsolete cop jargon directed at the evidently disturbed woman who initiated this latest scandal when she dropped a package in the street in front of White House on March 4 and then drove off, escaping arrest until two days later.    

Chaffetz told the Secret Service Director how he would have handled that situation.

“I want her taken down! I want a net to go over this city! ... Take ‘em down! Take ‘em down! That’s what I want to see happen.” 

Yes, he actually said I want a net to go over this city. Where did he get that from, some old film noir hard-boiled detective movie on TCM? It's of an era with 'if that dame tries to scram outta here, I'll pull my roscoe and ventilate her! Sweat that broad under the hot lights back in the squad room and she'll open up like a cheap suitcase! And don't youse let that doll talk to her mouthpiece until she spills the beans!'

His strange rant was promptly posted on the Oversight Committee’s You-Tube channel within minutes:


That Secret Service hearing was such a great stage for histrionic politicians that Trey Gowdy temporarily dropped his Benghazi select committee investigations to do some hasty and ill-prepared questioning of his own. He even stepped on Chaffetz's toes a little, trying to horn in on Chaffetz’s prerogative as Chairman for this one.

Gowdy mostly did some pointless quibbling with the Service's Director over the relative importance of Congressional oversight versus the Service OIG's investigative interest. Amusingly, he referred to "dueling narratives.” I think that's a bad phrase for someone who speaks with such a pronounced Deliverance accent.

The entire hearing is embedded below, just in case you're a glutton for punishment.